Dunkerque LNG Terminal
2012-2015
Liquefied Natural Gas storage
Entrepose Projects
Metalomechanical Erection
Metalomechanical construction of three LNG tanks, each with a capacity of 190.000m3, including all necessary equipment for the total conclusion of the works.